Performance
Cost of a stop
Tonnes and money lost while the machine is down, to help justify a repair or spare.
Selling price minus variable cost per tonne
Cost of this stop
11,475R
- Production lost
- 2.55 t
- Cost per minute down
- 255 R/min
How it's calculated
Lost tonnes = rate × minutes ÷ 60. Cost = lost tonnes × contribution per tonne + repair costs.